50x25D Extrusion main motor with two cross head Fiber Optic Cable Production Line fiber optic manufacturing
(1). Machine frame: it is assembled and welded with A3 steel plate and channel steel.
(2). Deceleration box: it is modeled on the Italian 173-10 type
- The square gearbox is cast formed with annealing, the material is
- The gear material: high chrome alloy steel
- The tooth surface of gear is high-frequency quenched and polished accurately, the index of noise is less then 75db, the gears are lubricated with the oil forcedly.
(3). PVC screw:
- Features: Suitable for the extrusion of PVC,PE and other plastic material,the plasticization 100%
- Material: ,hardness: above , the Nitrogenization :0.4-0.7mm, the surface is plated chromium.
- Diameter: 50mm(1piece of screw stem), L/D=25:1, extrusion output(max.): 90kg/h,the machine head is open(PVC material)
(4). Screw cylinder:
- Screw barrel inner diameter: 50mm,it is one piece type from gearbox junction to the machine head.
- Material: ,hardness: above HRC60-63, the nitrogenization:0.4-0.7mm
(5). Electric heating: the screw stem is heated by 4 sections by aluminum clarifier with voltage AC380V1.6KW/section.Japan RKC brand PID smart type temperature-controller plus contactor control.4 points temperature measuring, the precision of screw cylinder wall is ±2
(6). Cooling: 180W high-pressure centrifugal air blower work with temperature-controller to cool automatically.
(7). Main motor drive: AC 380V 22KW Siemens Beide AC frequency Motor is equipped with
AC 380V 22KW Nidec (orginal: Emerson) transducer control.
(8). Add a special low smoke halogen free screw,the plasticization 100%
(9). cross-head:two sets, one is FTTH drop cable special cross head, another is soft cable fine-adjustable cross head
- Customers Reviews
* Delivery Time.
We need 1-2 days to process your order before shipping. There are two shipping methoed.
Fast Delivery: The delivery time for US, European countries the delivery will take 3-5 days.
Slow Delivery: The delivery time for US, European countries the delivery will take 7-15 days.
* Tracking information.
After we ship package, customer receive automatic email with tracking details.
* Lost Package Policy.
If a package did not arrive in 2 weeks after the shipping date, then this package is treated as Lost. In this case a new package will be shipped to the customer provided we are able to give the same items as those purchased by the customer. If we are not able to provide the same items to substitute the lost ones we will either propose to the customer similar items or refund their cost as it will be mutually agree with the customer. If one or more items neither the same nor similar are available to be shipped, the customer can request to cancel the order entirely, thus the total cost of the order including shipping and handling cost will be fully refunded.
Recommended products
- ADSS Fiber Optic Cable Production Line
- US$210,000.00